Saturday, 17 July 2010

Solar panels


before


after


in between (installation by Lee and Ben from Norfolk Solar)

The panels should provide all the hot water we need throughout most of the year. All I have to do now is plumb the panels up to the hot water cylinder, with a pump, expansion vessel and control unit. All the hard stuff is now done.

3 comments:

Vallypee said...

Excellent Halfie!

Anonymous said...

I'm glad to see they turned up!

H Senior

Jan said...

So am I!