Showing posts with label Netherton Tunnel Branch. Show all posts
Showing posts with label Netherton Tunnel Branch. Show all posts

Wednesday, 18 September 2019

Oh no! What's happened to forward gear?

We left Windmill End for the final time this morning, after walking down to Lidl for some supplies.

Having passed through Netherton Tunnel we stopped just after Tividale Aqueduct for lunch.

At Dudley Port Junction we turned left onto the New Main Line and after a while came to the former Watery Lane Junction.

The plaque reads: The Tipton Green and Toll End Communication formerly crossed the Birmingham Level at this point 1809 - 1960.


It was good to feel the windlass in my hand again for Factory Locks after more than a week on the Birmingham Level. But at Lock 2 … Houston, we have a problem.

Jan, at the helm at the bottom of the lock, reported that it would go no faster than tickover in forward. I filled the lock and had a feel of the Morse control. It seemed to be physically obstructed in forward. I would have to take a proper look, but decided to do this on the lock landing above the top lock. Jan steered into Lock 1 on tickover, ascended the lock and stopped on the landing. With the deck boards up I could see the cable moving as it should. The Morse lever seemed to be hitting something much nearer to the control itself. Opening the door on which it is mounted I immediately saw the cause of the problem. (And here I should have taken a photo. Perhaps tomorrow.) A woodscrew holding a metal clip thing in position had come loose; the metal clip had rotated such that it was stopping the lever travelling much beyond the vertical. It was a matter of seconds to tighten the screw with the clip in what I hope is the right place - and we were up and running again.

At Factory Junction, a few yards from where we'd stopped, we turned left to head to the facilities by the Black Country Living Museum. On the way we passed the site of the Tipton Canal Festival.

At least, this is where some boats had congregated. A bit further on we came across Andy and Helen on Wand'ring Bark and The Jam Butty. We tied up in front of them after the services and joined them for a cup of tea. Later in the evening Chris and Sally of Kairos came for drinks.

Tomorrow we don't have to go anywhere or do anything (much)! Oh, apart from joining a group of people going to Mad O'Rourke's Pie Factory. Will I have another cow pie?

Tuesday, 10 September 2019

A tunnel that wasn't, and one that was (although currently unnavigable)

It was good to see the toll house at King's Norton Junction being renovated after the fire a year or so ago.

On the Worcester and Birmingham Canal and heading into Birmingham there was a new building awaiting us. It looked as though it was built right over the canal with a tunnel for boats...

… but when we got there we found the building - part of the University of Birmingham and seemingly called Unite Students - was just to the west of the canal.

The only tunnel was that built to accommodate the proposed restoration (and re-routing) of the Dudley No. 2 Canal. This used to run from very near here at Selly Oak to Hawne Basin via the (now collapsed) Lapal Tunnel. If the restoration succeeds it is likely that the new canal will be known as the Lapal Canal.

The (short) tunnel is directly behind the slender tree in the photo above.

We stopped just round the corner from Holliday Wharf and walked to the Apple store. Here my phone was looked at but they couldn't do anything to make it work again. Grr. I discovered there that none of my contacts has been backed up in something called iCloud. Double grr. I am therefore now having to use my old Nokia PAYG, with no e-mail or WhatsApp. Even text messages cost money.

After lunch we continued our journey to Windmill End for the Black Country Boating Festival this weekend. At the toll island on the Birmingham Canal New Main Line, just before the Engine Arm Aqueduct, we found that it has been taken over by a nascent beech forest. It gave the side of the boat a good rubbing.

A little later, on a bridge high over the canal, a heron perched.

Who can identify the bridge for me?

We turned left at Dudley Port Junction and took about 35 minutes to get through Netherton Tunnel. The sign at the entrance suggests that passage should take approximately 56 minutes (sic). Really? Perhaps I misread the sign. We are now at the site of the BCBF and will get stuck in - helping with the setup - tomorrow.

Tuesday, 13 September 2016

Overcharged

The computer's battery died without warning last night so here are two days' worth of blog posts in one. Yesterday morning started with sunshine (we had a small amount of rain later); here is Nansen II preparing to tow Leo from the Black Country Boating Festival.

The butty looks huge compared with the tug.

The combination will steer better with a tiller; it took a moment or two for the steerer to realise that the rudder was still tied back to the stern.

This is what I have been doing a lot of over the four and a half days we've been here at Windmill End: litter picking.

Jan has done a lot too, as well as helping in the office, table clearing and cleaning, marquee dismantling etc. Yesterday was a rubbish day. I shifted vast amounts of the stuff into skips.

In the evening we went for a meal at Ma Pardoe's, aka The Old Swan, in Netherton. I had an excellent lasagne which came with a load of delicious molten cheese on top. Barry and Sandra from the Homebrew boat Areandare joined us for drinks later.

And so to today. We went down to Hawne Basin for diesel and gas. Poor Jenny, who was manning the shop, was struggling with the computerised system and managed to overcharge me by mistake for the fuel - to the tune of £23. I realised only after we had returned through Gosty Hill Tunnel. We stopped and I phoned her; she apologised and implied I wasn't the only victim of the computer problems. I'll have to phone again tomorrow to give them my contact details and sort out how I can be refunded.

As we approached Gosty Hill Tunnel we observed two people acting strangely by the portal. At first we thought they were graffiti vandals; when we got closer it seemed as if they were inspecting the brickwork. When I asked them what they were doing they told me they were geocaching.

Jan steered through Netherton Tunnel; on the other side and all the way to Birmingham I saw quite a few herons. Most were on the bank; this one was high in a tree.

A minute or two before we arrived at the services at Cambrian Wharf we found ourselves under a sudden thunderstorm. The lightning and thunder were accompanied by heavy rain. We tied up on a pontoon at the wharf; shortly afterwards the rain stopped.